BTZS.org >> Forums home page
 
 Practical BTZS
 The BTZS System in Practice

Announcements | General Discussions | Plotter | ExpoDev Palm | Film & Paper Testing | Practical BTZS | ExpoDev for iOS



 
Messages 141 to 150 of 387 (Total: 387) First | Prev | Next | Last
Subject 
Author 
Date 
Re: streaks 
Miles  17:58 7 Oct 06 
once i get the water bath the right temp and I believe the tubes sre room temp or above I simply put the tubes in the refrigerator to no more then 15 seconds and that just seems to be right to take the ambient heat out of the pvc tube.They are not cold but that are not hot either. I load them fairly quickly but not rushed and off I go. I have measured the temp of the developer after a process cycle and it is always within 1 degree of the start temp. The pre soak cycle will get you some lost negs I assure you. I mentioned this to Fred Newman and he agrees that if it is a problem , even intermittent, eliminate that step. I like the quick chill technique. Don,t over do it though.
 
exceeds my material 
Jerry Cunningham  18:46 22 Aug 06 
Re: exceeds my material 
Jorge  19:23 22 Aug 06 
Re: exceeds my material 
Jerry Cunningham  20:40 22 Aug 06 
Metering/Exposing Uniformly Lit scene 
Paul  7:01 14 Aug 06 
Re: Metering/Exposing Uniformly Lit scene 
Phil Davis  16:43 14 Aug 06 
Re: Metering/Exposing Uniformly Lit scene 
Paul  7:19 15 Aug 06 
Changing light 
Steve Nicholls  22:12 9 Aug 06 
Re: Changing light 
Miles  8:09 11 Aug 06 
Re: Changing light 
Steve Nicholls  17:51 11 Aug 06 


BTZS.org >> Forums home page
 
 Note: The BTZS.org forums are now in read-only mode Last Updated: 22 Aug 2002